CHECKLIST / 004

What to check before the new site replaces the old one.

The list is deliberately concise. Each item represents a risk that is easy to miss when the new design takes all the attention.

PRE

Before the build

Keep a copy of the current site and list pages, forms, analytics, integrations, downloads and the most useful search queries.

  • URL inventory
  • content owner
  • known failures
  • success measure
BUILD

During the build

Check structure on a small screen, semantic headings, keyboard focus, contrast, images, metadata and behaviour without animation.

  • phone and keyboard
  • meaningful links
  • forms and errors
  • reduced motion
LIVE

Before release

Lock the redirect map and check sitemap, robots, canonical, hreflang, structured data, status codes and the privacy policy.

  • 301 map
  • 404 response
  • CSP and HTTPS
  • backup
POST

After release

Repeat key paths on the live domain and monitor unexpected 404 responses. Save the release date and verification results.